Power Transformer & Reactor Test System
PTTS System (a turnkey project) provided by Samgor mainly includes substation design, selection and procurement of special equipment, equipment installation and commissioning, system connection, system debugging, transformer testing, and training of test personnel. This test station is suitable for all factory (delivery) tests, type tests, and certain special tests of transformers.
Capable of meeting the routine test requirements for AC power transformers and reactors up to 1500 MVA and 1000 kV.
Features & Advantages:
✅ Turn-key project service with shortest delivery time of 6 months
✅ Low cost for material, low cost for system operating, high durability, small workplace occupation, highly automatic, good safety Module design, container structure, quick installation and commissioning
✅ Good safety, following international safety standard, equipped with safety control circuit
✅ Highly automatic, reducing labor intensity
✅ Easy to extend the capacity in future
✅ Able to do partial discharge test for the power transformer of up to 500kV class, without the shielded room
✅ Capability of operating no-load/load switching test for load tap changer on power trans-former
✅ Capability of 120% over-excitation test on the power transformer
✅ Easy maintenance and long life (>25 years)
Application:
✅ Transformer no-load / load loss measurement - IEC 60076-1
✅ Transformer induced voltage withstand / partial discharge measurement - IEC 60076-3 / IEC 60270
✅ Transformer temperature rise test - IEC 60076-2
✅ External power-frequency withstand voltage test - IEC 60076-3
✅ Lightning impulse test - IEC 60076-4
✅ Zero-sequence impedance measurement - IEC 60076-1
✅ Reactor loss measurement - IEC 60076-6
✅ Reactor induced voltage withstand / partial discharge measurement - IEC 60076-6 / IEC 60270
✅ Reactor temperature rise test - IEC 60076-3 / IEC 60076-6
✅ Other routine tests specified in the IEC 60076 standard
GET YOUR SOLUTION
Catalogue
-
2026-09-18 PTTS.pdf